Overall Equipment Effectiveness (OEE) answers one blunt question: of the time a machine was supposed to be making good parts, how much of it actually did? It's one of the most useful numbers in manufacturing, and one of the most often wrong, because it's still calculated from handwritten logs filled in at the end of a shift.
This guide shows how OEE is calculated, why manual OEE usually looks better than reality, and what you need to measure it automatically.
The OEE formula
OEE multiplies three factors:
OEE = Availability × Performance × Quality
| Factor | Question it answers | Formula | Losses it captures |
|---|---|---|---|
| Availability | Was the machine running when it was planned to? | Run time ÷ Planned production time | Breakdowns, changeovers, waiting for material or operators |
| Performance | When running, was it running at full speed? | (Ideal cycle time × Total count) ÷ Run time | Slow cycles, small stops |
| Quality | Were the parts good? | Good count ÷ Total count | Scrap, rework, start-up rejects |
A worked example
One machine, one 8-hour shift:
| Item | Value |
|---|---|
| Shift length | 480 minutes |
| Planned breaks | 30 minutes |
| Planned production time | 450 minutes |
| Stoppages (breakdown + changeover) | 45 minutes |
| Run time | 405 minutes |
| Ideal cycle time | 30 seconds per part (0.5 minutes) |
| Total parts made | 700 |
| Good parts | 680 |
- Availability = 405 ÷ 450 = 90.0%
- Performance = (0.5 × 700) ÷ 405 = 350 ÷ 405 = 86.4%
- Quality = 680 ÷ 700 = 97.1%
- OEE = 0.900 × 0.864 × 0.971 = 75.6%
Quick check: good parts × ideal cycle time ÷ planned time = (680 × 0.5) ÷ 450 = 75.6%. Same answer.
These figures are an example, not a benchmark.
What "good" OEE looks like
The figure most often quoted as "world class" is 85%: roughly 90% availability, 95% performance and 99.9% quality. It's credited to Seiichi Nakajima, who developed Total Productive Maintenance (TPM) in Japan.
Treat 85% as a direction, not a pass mark. It came from high-volume automotive lines, and benchmark studies suggest only a small share of plants reach it. What matters most is your own trend, measured the same way every week.
Why manual OEE is usually wrong
When OEE comes from shift logs, three things happen:
- Small stops disappear. A 2-minute jam isn't written down. Twenty of them a shift is 40 minutes, about 9% of the planned time in our example, and it vanishes from the log.
- Times are rounded. "Stopped 10:00 to 10:30" is rarely exactly right, and rounding tends to flatter the result.
- Reasons are vague. "Machine problem" doesn't tell maintenance anything. Without specific reasons you can't fix the biggest loss.
The result: manual OEE often looks better than reality, and the losses that matter most (small stops and slow cycles) are the ones it misses.
The six big losses
TPM groups production losses into six categories. Automatic OEE should tell you which one is costing you most.
| Loss | OEE factor | Typical source of the signal |
|---|---|---|
| Breakdowns | Availability | Machine stopped + reason |
| Setup and adjustments (changeovers) | Availability | Machine stopped + "changeover" reason |
| Small stops (jams, sensor trips, under ~5 minutes) | Performance | Short gaps in the run signal or part count |
| Reduced speed | Performance | Cycle time slower than ideal |
| Start-up rejects | Quality | Rejects counted after a changeover |
| Production rejects | Quality | Rejects during steady running |
What you need to measure OEE automatically
| Signal | Where it comes from |
|---|---|
| Run state (running, idle, stopped) | A PLC "run" bit, or a current clamp on the main motor |
| Part count | A PLC counter, or a proximity or photo sensor at the output |
| Reject count | A PLC counter, a reject chute sensor, or operator input |
| Planned production time | Shift calendar and planned breaks, entered once |
| Ideal cycle time | Per product, from engineering. This is the number most plants have to agree on first |
| Stop reasons | Operator selects a reason on a tablet or button box when a stop exceeds a set time. PLC alarm codes where available |
Many of these signals are already inside your PLCs and can be read without changing the machine's program. For machines without a controller, add-on sensors fill the gaps. (See retrofitting old machines and PLCs for IoT.)
From OEE number to action
An OEE dashboard is only useful if it changes what happens on the floor:
- Shift start: yesterday's OEE by machine, and the top three loss reasons.
- During the shift: an alert when availability on a machine drops below a threshold for more than a set time. For example, our platform can raise an alert like "Line 2 CNC-3 availability 54% for 15 minutes" and turn it into a work order in the ERP automatically.
- Weekly: losses ranked by minutes lost (a Pareto chart). Fix the biggest one first.
OEE software: build, buy or both?
| Option | Good when | Watch out for |
|---|---|---|
| Spreadsheet from manual logs | Getting started, 1–2 machines | Misses small stops and slow cycles |
| Off-the-shelf OEE software | Standard machines and processes | Connecting your mix of old and new machines may cost more than the licence |
| Custom or configurable platform + IoT | A mixed machine park, integration with ERP or MES, other monitoring (energy, condition) on the same system | Needs a clear scope and a pilot |
OEE is one part of real-time machine monitoring. Our Factory OS platform tracks OEE alongside predictive maintenance on the same system.
Frequently asked questions
How do you calculate OEE?
Multiply availability (run time ÷ planned time), performance (ideal cycle time × total count ÷ run time) and quality (good count ÷ total count). See the worked example above.
Is 85% OEE realistic?
It's an often-quoted "world class" figure, not a typical one. Many plants run well below it. Focus on improving your own measured trend.
Can we measure OEE on old machines?
Yes. A current clamp gives run state and an output sensor gives part count, even on machines with no PLC. Add a simple way for operators to record stop reasons.
What's the difference between OEE and machine utilisation?
Utilisation usually compares run time with total calendar time. OEE compares good output with what was possible in the planned time, so it also captures speed and quality losses.
How long before automatic OEE shows results?
The first honest baseline usually appears within a few weeks of reliable data. Improvement depends on acting on the top loss reasons each week.